Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We generally continually give you quite possibly the most conscientious shopper company, and the widest variety of designs and styles with finest materials. These endeavours include the availability of customized designs with speed and dispatch for Steel Water Dam , Flooding Flood Barrier , Flip Up Flood Protection Gate , We give priority to quality and customer pleasure and for this we follow stringent excellent control measures. We've got in-house testing facilities where our items are tested on every single aspect at different processing stages. Owning to latest technologies, we facilitate our clients with custom made creation facility.
Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Being supported by an state-of-the-art and skilled IT team, we could supply technical support on pre-sales & after-sales service for Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Albania , Japan , Madras , The working experience in the field has helped us forged a strong relations with customers and partners both in domestic and international market. For years, our products have been exported to more than 15 countries in the world and have been widely used by customers.

The company can keep up with the changes in this industry market, product updates fast and the price is cheap, this is our second cooperation, it's good.
5 Stars By Elizabeth from UAE - 2018.06.19 10:42
This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
5 Stars By Martha from Nepal - 2018.02.08 16:45