Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Our products are broadly identified and trustworthy by people and may meet continually modifying financial and social requires of Automatic Flood Defense Gate For Home , Automatic Flood Barrier , Flood Protection Wall , Welcoming interested businesses to cooperate with us, we look forward to owning the opportunity of working with companies around the planet for joint expansion and mutual results.
Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Wholesale Flood Protection Gate For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

We insist on offering high quality production with good business concept, honest sales and the best and fast service. it will bring you not only the high quality product and huge profit, but the most significant is to occupy the endless market for Wholesale Flood Protection Gate For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Singapore , Kyrgyzstan , Toronto , With the advanced workshop, professional design team and strict quality control system, based on mid- to high-end marked as our marketing positioning, our products are fast selling onto European and American markets with our own brands such as below Deniya, Qingsiya and Yisilanya.

We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
5 Stars By Joseph from Liberia - 2018.12.11 14:13
The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
5 Stars By Christina from Hanover - 2018.11.11 19:52