Top Quality Flood Defence - Embedded flood barrier for garage – JunLi Detail:
Model | water retaining height | installation mode | installation groove section | bearing capacity |
Hm4e-0012C | 1150 | embedded installation | width1540 * depth: 105 | heavy duty (small and medium-sized motor vehicles, pedestrian) |
Grade | Mark | Bearing capacity (KN) | Applicable occasions |
Heavy duty | C | 125 | underground parking lot, car parking lot, residential quarter, back street lane and other areas where only allow non-fast driving zone for small and medium-sized motor vehicles (≤ 20km / h). |
Regular maintenance and inspection for the automatic flood barrier
Warning! This equipment is an important flood control safety facility. The user unit shall designate professional personnel with certain mechanical and welding knowledge to conduct regular inspection and maintenance, and shall fill in the inspection and maintenance record form (see the attached table of the product manual) to ensure that the equipment is in good condition and normal use at all times! Only when the inspection and maintenance are carried out in strict accordance with the following requirements and the “inspection and maintenance record form” is filled in, can the company’s warranty terms take effect.
1 ) [important] every month and before each heavy rain, manually pull and place the door leaf at least once, and clean up the sundries in the bottom frame! In order to prevent the door leaf from being stuck by foreign matters and unable to be opened normally; at the same time, the sediment, leaves and other sundries inside the bottom frame and water inlet shall be cleaned up to prevent the water inlet channel (GAP) from being blocked after the door leaf is closed, which hinders the flow of water and can not produce buoyancy, resulting in the door leaf not being able to automatically open and block the water; the deposited sediment, leaves and other sundries will accelerate the corrosion and shorten the service life of the equipment. When the door leaf is opened, the warning light shall flash at high frequency.
1) [important] conduct water injection test at least once a year before flood season! At the front of the flood control barrier, sandbags or manual plates are used to make the dam enclosure, and the drainage switch at the rear under the bottom frame is closed with tools such as screwdrivers. Water is poured in between the dam enclosure and the flood control barrier. The door leaf shall be able to automatically do the water retaining, and there is no obvious water leakage as a whole, and the warning light shall flash at high frequency. In case of surface installation on the slope, the drain switch shall be turned on after the test.
Product detail pictures:
Related Product Guide:
Sticking to the perception of Creating products of top of the range and earning mates with people today from all over the world, we constantly put the desire of consumers in the first place for Top Quality Flood Defence - Embedded flood barrier for garage – JunLi, The product will supply to all over the world, such as: Liverpool , America , Paraguay , Insisting on the high quality generation line management and customers expert assistance, we now have designed our resolution to supply our buyers using the to start with amount getting and just after services practical experience. Maintaining the prevailing friendly relations with our buyers, we however innovate our solution lists all of the time to satisfy the brand new demands and adhere to the most up-to-date development of the market in Malta. We have been ready to face the worries and make the improve to understand all the possibilities in international trade.
By Sabrina from Zurich - 2018.07.26 16:51
We are old friends, the company's product quality has been always very good and this time the price is also very cheap.
By Elsie from Sri Lanka - 2017.07.28 15:46