Reliable Supplier Quick Dam - Embedded flood barrier Hm4e-0012C – JunLi Detail:
Model | water retaining height | installation mode | installation groove section | bearing capacity |
Hm4e-0012C | 1150 | embedded installation | width1540 * depth: 105 | heavy duty (small and medium-sized motor vehicles, pedestrian) |
Grade | Mark | Bearing capacity (KN) | Applicable occasions |
Heavy duty | C | 125 | underground parking lot, car parking lot, residential quarter, back street lane and other areas where only allow non-fast driving zone for small and medium-sized motor vehicles (≤ 20km / h). |
Embedded Installation of automatic flood barrier
(1) Embedded installation slot position:
a) It should be set behind the outermost intercepting ditch. Reasons: small water can be discharged through the intercepting ditch; when flood occurs, the municipal pipeline will be backfilled from the intercepting ditch when the water is full.
b) The higher the installation position, the higher the water retaining level.
(2) Discharge capacity of residual water in the installation tank:
a) A 50 * 150 water collecting tank is reserved at the bottom of the installation slot, and a Φ 100 drainage pipe is reserved at the bottom of the water collecting tank.
b) Discharge test: after pouring some water, the water can be discharged smoothly from the drain pipe.
(3) The levelness of the installation surface:
The installation surface horizontal height difference of the two sides should be ≤ 30mm (measured by laser level meter)
(4) The flatness of the installation surface:
According to the quality acceptance code of construction ground engineering GB 50209-2010, the surface flatness deviation should be ≤2mm ( applied 2m guiding ruler and wedge feeler gauge). Otherwise, the ground should be leveled first, or the bottom framework will leak after installation.
(5) Installation surface strength
a) The installation surface is made of at least C20 concrete with thickness ≥Y and the surrounding horizontal extension X ≥300mm or using equivalent strength of installation surface.
b) The installation surface should be free of cracks, hollowing, falling off , etc. The concrete should be qualified for the quality acceptance code of concrete structure engineering GB50204-2015, otherwise, need remade concrete installation surface according to the requirement.
c) In case of concrete, it should beyond curing period.
(6) Side walls
a) Side wall height should be higher than the flood barrier, otherwise it should be created.
b) The side walls should be made of solid brick or concrete or equivalent installation surface. If the wall is of metal or nonmetal material, relevant reinforcement should be applied.
How the hydrodynamic automatic flood barrier retain water
Product detail pictures:
Related Product Guide:
As a way to ideal meet up with client's desires, all of our operations are strictly performed in line with our motto High Top quality, Competitive Cost, Fast Service for Reliable Supplier Quick Dam - Embedded flood barrier Hm4e-0012C – JunLi, The product will supply to all over the world, such as: Canberra , America , panama , We integrate all our advantages to continuously innovate, improve and optimize our industrial structure and product performance. We will always believe in and work on it. Welcome to join us to promote green light, together we will make a better Future!
By Jean Ascher from New Delhi - 2017.05.02 18:28
The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
By Molly from Oman - 2017.03.28 16:34