Reliable Supplier Quick Dam - Embedded flood barrier Hm4e-0012C – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We insist on the principle of development of 'High quality, Efficiency, Sincerity and Down-to-earth working approach' to provide you with excellent service of processing for Flood Control Barrier , Flood Gate For Metro , Self-Closing Flood Defense Barrier , Making the Products and solutions of Superior Quality may be the eternal target of our company. We make unremitting attempts to comprehend the objective of We Will Often Preserve in Pace along with the Time.
Reliable Supplier Quick Dam - Embedded flood barrier Hm4e-0012C – JunLi Detail:

Model water retaining height installation mode installation groove section bearing capacity
Hm4e-0012C  1150 embedded installation width1540 * depth: 105  heavy duty (small and medium-sized motor vehicles, pedestrian)

 

Grade Mark Bearing capacity (KN) Applicable occasions
Heavy duty C 125 underground parking lot, car parking lot, residential quarter, back street lane and other areas where only allow non-fast driving zone for small and medium-sized motor vehicles (≤ 20km / h).

Embedded Installation of automatic flood barrier

(1) Embedded installation slot position:

a) It should be set behind the outermost intercepting ditch. Reasons: small water can be discharged through the intercepting ditch; when flood occurs, the municipal pipeline will be backfilled from the intercepting ditch when the water is full.

b) The higher the installation position, the higher the water retaining level.

(2) Discharge capacity of residual water in the installation tank:

a) A 50 * 150 water collecting tank is reserved at the bottom of the installation slot, and a Φ 100 drainage pipe is reserved at the bottom of the water collecting tank.

b) Discharge test: after pouring some water, the water can be discharged smoothly from the drain pipe.

(3) The levelness of the installation surface:

The installation surface horizontal height difference of the two sides should be ≤ 30mm (measured by laser level meter)

(4) The flatness of the installation surface:

According to the quality acceptance code of construction ground engineering GB 50209-2010, the surface flatness deviation should be ≤2mm ( applied 2m guiding ruler and wedge feeler gauge). Otherwise, the ground should be leveled first, or the bottom framework will leak after installation.

(5) Installation surface strength

a) The installation surface is made of at least C20 concrete with thickness ≥Y and the surrounding horizontal extension X ≥300mm or using equivalent strength of installation surface.

b) The installation surface should be free of cracks, hollowing, falling off , etc. The concrete should be qualified for the quality acceptance code of concrete structure engineering GB50204-2015, otherwise, need remade concrete installation surface according to the requirement.

c) In case of concrete, it should beyond curing period.

(6) Side walls

a) Side wall height should be higher than the flood barrier, otherwise it should be created.

b) The side walls should be made of solid brick or concrete or equivalent installation surface. If the wall is of metal or nonmetal material, relevant reinforcement should be applied.

1 (1)

How the hydrodynamic automatic flood barrier retain water

3


Product detail pictures:

Reliable Supplier Quick Dam -
 Embedded flood barrier Hm4e-0012C – JunLi detail pictures

Reliable Supplier Quick Dam -
 Embedded flood barrier Hm4e-0012C – JunLi detail pictures

Reliable Supplier Quick Dam -
 Embedded flood barrier Hm4e-0012C – JunLi detail pictures


Related Product Guide:

We intention to see quality disfigurement within the creation and supply the ideal support to domestic and overseas buyers wholeheartedly for Reliable Supplier Quick Dam - Embedded flood barrier Hm4e-0012C – JunLi, The product will supply to all over the world, such as: Nairobi , Mali , Johannesburg , In order to carry out our goal of customer first and mutual benefit in the cooperation, we establish a specialist engineering team and a sales team to supply the best service to satisfy our customers' requirements. Welcome you to cooperate with us and join us. We have been your best choice.

The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.
5 Stars By Dorothy from Slovakia - 2017.06.16 18:23
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
5 Stars By Rita from Maldives - 2017.11.29 11:09