PriceList for Water Control Solutions For Flood Protection - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We insist on offering high quality production with good business concept, honest sales and the best and fast service. it will bring you not only the high quality product and huge profit, but the most significant is to occupy the endless market for Anti Water Flooding Barrier , Flood Mitigation Equipment Manufacturer , Automatic Flood Defense Barrier For Garage , We are now on the lookout ahead to even larger cooperation with abroad consumers dependant on mutual added benefits. When you are interested in almost any of our products, be sure to experience cost-free to make contact with us for more facts.
PriceList for Water Control Solutions For Flood Protection - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

PriceList for Water Control Solutions For Flood Protection -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

PriceList for Water Control Solutions For Flood Protection -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

PriceList for Water Control Solutions For Flood Protection -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

We'll make every effort and hard work to be superb and excellent, and speed up our steps for standing inside the rank of intercontinental top-grade and high-tech enterprises for PriceList for Water Control Solutions For Flood Protection - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Turin , Russia , Jakarta , They're durable modeling and promoting effectively all over the world. Under no circumstances disappearing major functions in a quick time, it's a really should in your case of excellent good quality. Guided by the principle of Prudence, Efficiency, Union and Innovation. the company make a terrific efforts to expand its international trade, raise its company profit and raise its export scale. We're confident that we've been planning to possess a vibrant prospect and to be distributed all over the world within the years to come.

The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
5 Stars By Raymond from Borussia Dortmund - 2018.06.21 17:11
The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
5 Stars By Esther from Jeddah - 2018.04.25 16:46