PriceList for Water Control Solutions For Flood Protection - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We thinks what customers think, the urgency of urgency to act in the interests of a customer position of principle, allowing for better quality, lower processing costs, prices are more reasonable, won the new and old customers the support and affirmation for Automatic Hydrodynamic Flood Barrier , Flood Barrier For Subway , Automatic Water Dams Door , Accurate process devices, Advanced Injection Molding Equipment, Equipment assembly line, labs and software development are our distinguishing feature.
PriceList for Water Control Solutions For Flood Protection - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

PriceList for Water Control Solutions For Flood Protection -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

PriceList for Water Control Solutions For Flood Protection -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

PriceList for Water Control Solutions For Flood Protection -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

We pursue the management tenet of Quality is remarkable, Company is supreme, Name is first, and will sincerely create and share success with all clientele for PriceList for Water Control Solutions For Flood Protection - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Luxembourg , Tunisia , Brunei , We have more than 10 years experience of production and export business. We always develop and design kinds of novel products to meet the market demand and help the guests continuously by updating our products. We are specialized manufacturer and exporter in China. Wherever you are, please join us, and together we will shape a bright future in your business field!

Products and services are very good, our leader is very satisfied with this procurement, it is better than we expected,
5 Stars By Nora from Zimbabwe - 2017.05.21 12:31
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
5 Stars By Sophia from Myanmar - 2017.03.28 16:34