Hot-selling Automatic Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Normally customer-oriented, and it's our ultimate concentrate on for being not only one of the most dependable, trustable and honest supplier, but also the partner for our shoppers for Hydrodynamic Flip Up Floodgate , Aluminum Flood Defence , Automatic Flood Door For Metro , We are expecting to cooperate with you on the basis of mutual benefits and common development. We will never disappoint you.
Hot-selling Automatic Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Hot-selling Automatic Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot-selling Automatic Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot-selling Automatic Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our personnel are always inside the spirit of continuous improvement and excellence, and together with the outstanding excellent goods, favorable price and good after-sales services, we try to gain every customer's trust for Hot-selling Automatic Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Sudan , Bhutan , Belize , Good quality and reasonable price are our business principles. If you are interested in our products or have any questions, please feel free to contact us. We hope to establish cooperative relationships with you in the near future.

The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
5 Stars By Monica from Egypt - 2017.03.28 16:34
We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
5 Stars By Kay from El Salvador - 2017.09.09 10:18