Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Every member from our high efficiency sales team values customers' needs and business communication for Quick Dam Flood Defense Barrier , Self-Locking Automatic Water Dams , Flood Protection Solutions For Metro , We welcome new and old clients from all walks of lifestyle to speak to us for potential organization relationships and mutual success!
Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Dedicated to strict quality control and thoughtful customer service, our experienced staff members are always available to discuss your requirements and ensure full customer satisfaction for Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Greece , Slovakia , Mali , With the goal of zero defect. To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.

The after-sale warranty service is timely and thoughtful, encounter problems can be resolved very quickly, we feel reliable and secure.
5 Stars By Nina from Stuttgart - 2017.07.28 15:46
Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
5 Stars By Jack from Jordan - 2017.06.16 18:23