Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We love an incredibly fantastic standing amid our consumers for our superb item high quality, aggressive rate and also the finest assistance for Flood Door Barrier , Automatic Flood Protection Door , Automatic Flood Door , We are sincerely looking forward to establishing good cooperative relationships with customers from at home and abroad for creating a bright future together.
Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Hot New Products Self Deploying Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our primary target will be to provide our clients a serious and responsible small business relationship, supplying personalized attention to all of them for Hot New Products Self Deploying Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Philippines , Hungary , Kyrgyzstan , We strongly believe that technology and service is our base today and quality will create our reliable walls of future. Only we have better and better quality , could we achieve our customers and ourselves, too. Welcome customers all over the word to contact us for getting further business and reliable relationships. We are always here working for your demands whenever you need.

The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
5 Stars By Marcie Green from Estonia - 2017.11.29 11:09
As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
5 Stars By Ruth from Bangkok - 2017.03.28 16:34