High Quality Flood Protection Solutions - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

The really abundant projects administration experiences and just one to one particular provider model make the substantial importance of organization communication and our easy understanding of your expectations for Home Use Aluminum Door Protection Flood Barrier , Quick Dam , Automatic Flood Dam , Our products are widely used in many industrial fields. Our Company Services Division in good faith for the purpose of the quality of survival. All for customer service.
High Quality Flood Protection Solutions - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

High Quality Flood Protection Solutions -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

High Quality Flood Protection Solutions -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

High Quality Flood Protection Solutions -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Persisting in High quality, Prompt Delivery, Competitive Price, we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' high comments for High Quality Flood Protection Solutions - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Las Vegas , Grenada , Germany , Further, we are supported by highly experienced and knowledgeable professionals, who have immense expertise in their respective domain. These professionals work in close coordination with each other to offer our clients an effective range of products.

The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
5 Stars By Elaine from Mombasa - 2017.08.18 11:04
Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
5 Stars By Alexandra from Denmark - 2018.05.13 17:00