High Quality Flood Protection Solutions - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We have been also specializing in improving the things administration and QC system to ensure that we could preserve terrific gain within the fiercely-competitive company for Self Closing Passive Flood Barrier , Flood Aluminum Barrier Inflatable , Flood Control Sandbag Dam Bags Self , As a leading manufacture and exporter, we appreciate a great status inside the international markets, especially in America and Europe, because of our top high-quality and sensible charges.
High Quality Flood Protection Solutions - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

High Quality Flood Protection Solutions -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

High Quality Flood Protection Solutions -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

High Quality Flood Protection Solutions -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Reliable quality and good credit standing are our principles, which will help us at a top-ranking position. Adhering to the tenet of quality first, customer supreme for High Quality Flood Protection Solutions - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Costa Rica , Atlanta , Danish , What is good price? We provide customers with factory price. In the premise of good quality, efficiency must be paid attention to and maintain appropriate low and healthy profits. What is a fast delivery? We make the delivery according to customers' requirements. Although delivery time depends on the order quantity and the complexity of it, we still try to supply products in time. Sincerely hope we could have long term business relationship.

Hope that the company could stick to the enterprise spirit of Quality, Efficiency, Innovation and Integrity, it will be better and better in the future.
5 Stars By Roberta from United States - 2017.05.02 11:33
This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
5 Stars By Deirdre from New Zealand - 2017.07.28 15:46