Fast delivery Automatic Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Always customer-oriented, and it's our ultimate goal to get not only by far the most reputable, trustable and honest supplier, but also the partner for our customers for Automatic Flood Door For Home , Flood Mitigation , Quick Dam Automatic Flood Barrier , All the opinions and suggestions will be greatly appreciated! The good cooperation could improve both of us into better development!
Fast delivery Automatic Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Fast delivery Automatic Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Fast delivery Automatic Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Fast delivery Automatic Flood Protection Barrier For Metro -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Often customer-oriented, and it's our ultimate target to become not only probably the most reputable, trustable and honest provider, but also the partner for our customers for Fast delivery Automatic Flood Protection Barrier For Metro - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Guinea , Liberia , Manchester , We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.

The manufacturer gave us a big discount under the premise of ensuring the quality of products, thank you very much, we will select this company again.
5 Stars By Amelia from United Arab Emirates - 2018.09.21 11:01
Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
5 Stars By Edwina from Paraguay - 2017.08.18 18:38