Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

With our leading technology also as our spirit of innovation,mutual cooperation, benefits and development, we are going to build a prosperous future jointly with your esteemed company for Flood Barrier For Subway , Aluminum Flood Panel , Inflated Flood Barrier , Our company is working through the procedure principle of integrity-based, cooperation created, people oriented, win-win cooperation. We hope we can have a pleasant relationship with businessman from all around the earth.
Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our products are greatly recognized and trustworthy by users and will fulfill continually shifting economic and social requires for Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Bogota , Manila , Kuwait , At present our sales network is growing continually, improving service quality to meet customer's demand. If you are interested in any products , please contact us at anytime. We are looking forward to forming successful business relationships with you in near future.

It is really lucky to meet such a good supplier, this is our most satisfied cooperation, I think we will work again!
5 Stars By Mary from New Zealand - 2018.11.04 10:32
High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
5 Stars By Andy from Poland - 2017.08.28 16:02