Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We usually keep on with the principle Quality To start with, Prestige Supreme. We've been fully committed to offering our purchasers with competitively priced excellent solutions, prompt delivery and skilled support for Hydrodynamic Flood Barrier , Flood Control Sandbag Dam Bags Self , Entryway Flood Protection Gate , Our enterprise insists on innovation to promote the sustainable advancement of organization, and make us become the domestic high-quality suppliers.
Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Factory Supply Quick Dam Flood Protection Gate -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Reliable good quality and very good credit standing are our principles, which will help us at a top-ranking position. Adhering to your tenet of quality 1st, purchaser supreme for Factory Supply Quick Dam Flood Protection Gate - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Mozambique , Swaziland , Czech republic , During in 11 years, We've participated in more than 20 exhibitions, obtains the highest praise from each customer. Our company has been devoting that customer first and committed to helping customers expand their business, so that they become the Big Boss !

Staff is skilled, well-equipped, process is specification, products meet the requirements and delivery is guaranteed, a best partner!
5 Stars By Yannick Vergoz from Zimbabwe - 2018.09.21 11:01
The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
5 Stars By Andrea from Istanbul - 2018.06.19 10:42