Chinese wholesale Automatic Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Our firm promises all consumers with the first-class products as well as most satisfying post-sale services. We warmly welcome our regular and new consumers to join us for Automatic Flood Defense Door For Building , Automatic Flood Prevention , Self-Deploy Automatic Flood Gate , With advantage of industry management, the business has generally been committed to supporting prospects to become the current market leader in their respective industries.
Chinese wholesale Automatic Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

Chinese wholesale Automatic Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Chinese wholesale Automatic Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

Chinese wholesale Automatic Flood Protection Barrier -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

No matter new customer or previous client, We believe in prolonged time period and trustworthy relationship for Chinese wholesale Automatic Flood Protection Barrier - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Bahamas , Guatemala , Lisbon , Our company will continue to adhere to the superior quality, reputable, the user first principle wholeheartedly. We warmly welcome friends from all walks of life to visit and give guidance, work together and create a brilliant future!

In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
5 Stars By Gloria from Lithuania - 2018.03.03 13:09
Customer service staff and sales man are very patience and they all good at English, product's arrival is also very timely, a good supplier.
5 Stars By Jeff Wolfe from Greek - 2018.09.21 11:44