2019 wholesale price Flood Protection Barrier For Subway - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We usually believe that one's character decides products' high quality, the details decides products' excellent ,with the REALISTIC,EFFICIENT AND INNOVATIVE staff spirit for Self Deploy Hydrodynamic Flood Barrier , Flood Gate Systems , Flood Obstacle Sand Bag , We look forward to establish a long-term business relationship with your esteem co-operation.
2019 wholesale price Flood Protection Barrier For Subway - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

2019 wholesale price Flood Protection Barrier For Subway -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 wholesale price Flood Protection Barrier For Subway -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 wholesale price Flood Protection Barrier For Subway -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our products are broadly regarded and reliable by end users and can meet up with constantly transforming financial and social requires of 2019 wholesale price Flood Protection Barrier For Subway - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Mombasa , Chile , Swedish , We hope we can establish long-term cooperation with all of the customers. And hope we can improve competitiveness and achieve the win-win situation together with the customers. We sincerely welcome the customers from all over the world to contact us for anything you need!

It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
5 Stars By Elizabeth from Ecuador - 2018.07.12 12:19
After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
5 Stars By Julia from Borussia Dortmund - 2018.09.19 18:37