2019 wholesale price Flood Protection Barrier For Subway - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

We thinks what customers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better good quality, lower processing costs, prices are extra reasonable, won the new and old buyers the support and affirmation for Flood Defense Products , Flood Control System , Quick Dam Automatic Flood Barrier , We sincerely welcome overseas customers to consult for the long-term cooperation and the mutual development.We strongly believe that we can do better and better.
2019 wholesale price Flood Protection Barrier For Subway - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

2019 wholesale price Flood Protection Barrier For Subway -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 wholesale price Flood Protection Barrier For Subway -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 wholesale price Flood Protection Barrier For Subway -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs of 2019 wholesale price Flood Protection Barrier For Subway - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Albania , Indonesia , Auckland , In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we are going to continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.

In China, we have purchased many times, this time is the most successful and most satisfactory, a sincere and realiable Chinese manufacturer!
5 Stars By Austin Helman from Irish - 2017.09.22 11:32
Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
5 Stars By Ida from Juventus - 2017.02.14 13:19