2019 High quality Flood Barrier For Home - Embedded flood barrier Hm4e-0012C – JunLi Detail:
Model | water retaining height | installation mode | installation groove section | bearing capacity |
Hm4e-0012C | 1150 | embedded installation | width1540 * depth: 105 | heavy duty (small and medium-sized motor vehicles, pedestrian) |
Grade | Mark | Bearing capacity (KN) | Applicable occasions |
Heavy duty | C | 125 | underground parking lot, car parking lot, residential quarter, back street lane and other areas where only allow non-fast driving zone for small and medium-sized motor vehicles (≤ 20km / h). |
Embedded Installation of automatic flood barrier
(1) Embedded installation slot position:
a) It should be set behind the outermost intercepting ditch. Reasons: small water can be discharged through the intercepting ditch; when flood occurs, the municipal pipeline will be backfilled from the intercepting ditch when the water is full.
b) The higher the installation position, the higher the water retaining level.
(2) Discharge capacity of residual water in the installation tank:
a) A 50 * 150 water collecting tank is reserved at the bottom of the installation slot, and a Φ 100 drainage pipe is reserved at the bottom of the water collecting tank.
b) Discharge test: after pouring some water, the water can be discharged smoothly from the drain pipe.
(3) The levelness of the installation surface:
The installation surface horizontal height difference of the two sides should be ≤ 30mm (measured by laser level meter)
(4) The flatness of the installation surface:
According to the quality acceptance code of construction ground engineering GB 50209-2010, the surface flatness deviation should be ≤2mm ( applied 2m guiding ruler and wedge feeler gauge). Otherwise, the ground should be leveled first, or the bottom framework will leak after installation.
(5) Installation surface strength
a) The installation surface is made of at least C20 concrete with thickness ≥Y and the surrounding horizontal extension X ≥300mm or using equivalent strength of installation surface.
b) The installation surface should be free of cracks, hollowing, falling off , etc. The concrete should be qualified for the quality acceptance code of concrete structure engineering GB50204-2015, otherwise, need remade concrete installation surface according to the requirement.
c) In case of concrete, it should beyond curing period.
(6) Side walls
a) Side wall height should be higher than the flood barrier, otherwise it should be created.
b) The side walls should be made of solid brick or concrete or equivalent installation surface. If the wall is of metal or nonmetal material, relevant reinforcement should be applied.
How the hydrodynamic automatic flood barrier retain water
Product detail pictures:
Related Product Guide:
We believe that prolonged time period partnership is really a result of top of the range, benefit added provider, prosperous knowledge and personal contact for 2019 High quality Flood Barrier For Home - Embedded flood barrier Hm4e-0012C – JunLi, The product will supply to all over the world, such as: Pakistan , Manila , Denver , Actually need to any of those objects be of interest to you, make sure you allow us to know. We'll be delighted to present you a quotation on receipt of one's comprehensive specs. We've our individual specialist R&D enginners to meet any of the requriements, We look forward to receiving your enquires soon and hope to have the chance to work together with you inside the future. Welcome to take a look at our organization.
By Sara from Mozambique - 2017.10.27 12:12
The sales person is professional and responsible, warm and polite, we had a pleasant conversation and no language barriers on communication.
By King from Ecuador - 2017.12.09 14:01