2019 China New Design Flood Protection Solutions For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi

Short Description:


Product Detail

FAQ

Product Tags

Related Video

Feedback (2)

Our goods are commonly recognized and reliable by consumers and may satisfy continually developing economic and social needs for Automatic Flood Defense Door For Garage , Water Activated Barrier , Self Closing Flood Door For Home , Welcome to make contact with us if you're fascinated inside our product, we are going to provide you with a surprice for Qulity and Value.
2019 China New Design Flood Protection Solutions For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi Detail:

Model water retaining height Installation mode bearing capacity
Hm4d-0006E  620 surface mounted (pedestrian only)metro type

Scope of application

Grade Mark Bearing capacity (KN) Applicable occasions
Metro type E 7.5 Metro entrance and exit.

The Model Hm4d-0006E hydrodynamic automatic flood barrier is applicable to the entrance and exit of subway or metro train stations where allow for pedestrian only.

(1) Surface installation location

a ) It is about 5cm high from the ground. Need to prevent it from scratching the vehicle bottom when the vehicle is fully loaded. When the car is fully loaded, the minimum ground clearance: Pentium B70 = 95mm, Honda Accord = 100mm, Feidu = 105mm, etc. 

b) )The location should be on the horizontal section at the top of the ramp, the inside of the outermost intercepting ditch, or installed on the intercepting ditch. Reasons: small water can be discharged through intercepting ditch; it can prevent backflow from intercepting ditch after municipal pipeline is full.

c)The higher the installation location, the higher the water retaining level.

(1) The levelness of the installation surface

a) The installation surface horizontal height difference at the end of the wall on both sides ≤ 30mm (measured by laser level meter)

(2) The flatness of the installation surface

a) According to code for acceptance of construction quality of building ground engineering (GB 50209-2010), the surface flatness deviation shall be ≤ 2mm (measured with 2m guiding rule and wedge feeler gauge), otherwise, the ground shall be leveled first, or the bottom frame will leak after installation.

b) In particular, the ground with anti-skid treatment shall be leveled first.

7

8


Product detail pictures:

2019 China New Design Flood Protection Solutions For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 China New Design Flood Protection Solutions For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures

2019 China New Design Flood Protection Solutions For Underground Construction -
 Surface type Automatic flood barrier for Metro – JunLi detail pictures


Related Product Guide:

All we do is often involved with our tenet Purchaser to start with, Rely on initially, devoting over the food stuff packaging and environmental defense for 2019 China New Design Flood Protection Solutions For Underground Construction - Surface type Automatic flood barrier for Metro – JunLi, The product will supply to all over the world, such as: Lisbon , Montreal , Zambia , We have exported our products all over the world, especially the USA and European countries. Furthermore, all of our products are manufactured with advanced equipment and strict QC procedures to ensure high quality.If you are interested in any of our products, please don't hesitate to contact us. We will try our best to meet your needs.

The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
5 Stars By Carey from Swiss - 2018.09.29 13:24
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
5 Stars By Gladys from Mexico - 2018.06.30 17:29